Productivity Enhancement & Operational Audit Including SOx & NOx & Alternate Fuel System + Carbon Credit Aspect.

• Study the present condition of plant and machinery.

• Assessment of the present condition of the Plant infrastructure.

• Study of the existing limestone mines.

• Study the status of Pollution, Environment and Reserve Forest with respect to the Plant & Mines.

• Possibility of balancing the plant and machinery in different unit operations for optimizing the production levels.

• Study the requirement of additional equipment / machinery to meet the increased production.

• Cost of production before & after up-gradation.

• Submission of report for the plant covering all the above aspects and giving recommendation.


• Study the present condition of the plant and machinery and suggest whether any long term or short term modernization / modifications or any major maintenance work is required to optimize the production of clinker / cement.

• Check for any short coming or deficiencies in the Clinker / Cement sections, which are either inherent or not practically possible to rectify and highlight the consequence of the same.

• Study of the existing limestone mines to assess the availability of balance limestone reserves & run of mine quality.

• Study on status of Pollution, Environment and Reserve Forest.

• Assess the plant and machinery and evaluate the costs with respect to today’s value / cost.

• Study the Plant in operation from Mining Operation to Crusher and Crusher to Packing Plant, including loading / dispatches by Trucks, Railways etc.

• Study the present level of power consumption, fuel consumption, capacity utilization and other efficiency parameters.

• Submission of report for the plant covering all the above aspects and giving recommendation.